10.6. Gear shifting mechanism

Removal

 PERFORMANCE ORDER

  1. Edge of the flat screw-driver remove the top cover of the central console.
  1. Turn out screws and remove the lower part of the central console.
  1. Remove side covers of the central console.
  1. Remove pins and clips from the gear shifting lever.
  2. Remove the gear shifting lever assembled.
  3. Turn out bolts and remove a clamp.
  4. you nimit pins and clips from the transmission.
  1. Remove cables of switching and choice of transfers.

Check

 PERFORMANCE ORDER

  1. Check functioning of cables of the choice and gear shifting and absence of damage.
  2. Check a cover for absence of damage.
  3. Check each plug for lack of wear and damages.
  4. Check a spring for absence of damage and elasticity reduction.

Assembly

 PERFORMANCE ORDER

  1. Apply jellied lubricant on the surfaces of sliding of plugs.
  2. Assembly of the lever of gear shifting is carried out to the sequences to the return dismantling.

Installation

 PERFORMANCE ORDER

  1. Install the gear shifting lever assembled.
  2. Establish a cable of switching and the choice of transfers.